Título: Retrofit da subestação do Hospital Universitário da Grande Dourados
Autor(es): Lima, Caio César Camioli de
Primeiro Orientador: Biasotto, Etienne
metadata.dc.contributor.referee1: Gibelli, Gerson Bessa
metadata.dc.contributor.referee2: Turdera, Eduardo Mirko Valenzuela
Resumo: O presente trabalho apresenta uma proposta de dimensionamento para a aplicação de um retrofit segundo as normativas vigentes na subestação do Hospital Universitário da Grande Dourados, localizado em Dourados, MS. A proposta se inicia avaliando as condições atuais do hospital, fazendo o levantamento do diagrama unifilar e especificando os equipamentos presentes. A segunda parte segue com a identificação das inconformidades presente na subestação segundo as normativas vigentes. Além das inconformidades, também foi feito o dimensionamento dos novos equipamentos, levando em conta todas as expansões futuras do hospital. Após detectado que os equipamentos atuais não atenderiam as demandas futuras e que os mesmos não estão correspondendo as normas, foi detectada a necessidade da aplicação de um retrofit que foi proposto em um novo diagrama unifilar, uma nova planta para a subestação e novos equipamentos que atendam tanto a demanda como as normas. Foi realizado um orçamento dessa proposta visando as condições financeiras do hospital e apresentado para o órgão responsável onde foi aprovado para a execução. Chegando então a conclusão que a aplicação do retrofit possibilitará um desempenho mais adequado ao sistema elétrico responsável por atender todo o hospital.
Abstract: The present paper proposes a retrofit design, according to the regulations in force, for the substation of the Hospital Universitário da Grande Dourados, located in Dourados, MS. The proposal begins by evaluating the current hospital conditions, rising data and making the singleline diagram, and specifying the existing equipment. The second part follows with the identification of the shortcomings at the substation according to the current regulations. In addition to the non-conformities, it was also made a research around the specifications for the new equipment, taking into account all future expansions of the hospital. After detected that the current equipment would not meet future demands and that they are not meeting the standards, it was proved the need for a retrofit that was proposed in a new single-line diagram, a new plant for the substation and new equipment that meet both demand and regulation standards. A budget for this proposal was carried out, being aware of the hospital's financial condition, which was presented to the responsible body where it has been approved for implementation. Then coming to the conclusion, the implementation of the retrofit will enable a better performance to the electrical system of the hospital.
Palavras-chave: Hospital universitário
University hospitals
Eficiência energética
Energy efficiency
Subestação elétrica
Electric substations
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA ELETRICA
Idioma: por
País: Brasil
Editor: Universidade Federal da Grande Dourados
Sigla da Instituição: UFGD
metadata.dc.publisher.department: Faculdade de Engenharia
Citação: LIMA, Caio César Camioli de. Retrofit da subestação do Hospital Universitário da Grande Dourados. 2016. Trabalho de Conclusão de Curso (Bacharelado em Engenharia de Energia) – Faculdade de Ciências Biológicas e Ambientais, Universidade Federal da Grande Dourados, Dourados, MS, 2016.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ufgd.edu.br/jspui/handle/prefix/3300
Data do documento: 7-Out-2016
Aparece nas coleções:Engenharia de Energia

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
CaioCesarCamiolideLima.pdf4,42 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.