Use este identificador para citar ou linkar para este item: http://repositorio.ufgd.edu.br/jspui/handle/prefix/5839
Tipo: Trabalho de Conclusão de Curso
Título: Dimensionamento e instalação de sistema fotovoltaico On-grid na propriedade rural Santa Luzia
Título(s) alternativo(s): Sizing and installation of On-grid photovoltaic system on rural property Santa Luzia
Autor(es): Castro, Gustavo Pleutin
Pleutin, Tainá Ribeiro Rodrigues
Primeiro Orientador: Rafull, Leidy Zulys Leyva
metadata.dc.contributor.referee1: Moreira Junior, Orlando
metadata.dc.contributor.referee2: Orlando, Roberto Carlos
Resumo: Fonte de energia gratuita e abundante, o sol rege todas as atividades biológicas do planeta e pode ser utilizado para a geração de energia elétrica. Com o avanço da tecnologia, a descoberta dos materiais semicondutores e o desenvolvimento das células fotovoltaicas, um leque de possibilidades se abriu, possibilitando o crescimento e a expansão de investimentos e estudos focados na geração e armazenamento de energia elétrica a partir de fontes solares. Atualmente o mercado de energia solar está em pleno desenvolvimento, devido a diminuição dos custos dos equipamentos e ao período de retorno do investimento, isso se deve à possibilidade de instalação dos sistemas fotovoltaicos conectados à rede, que permitem a geração de créditos de energia junto a concessionária. Buscando reduzir os custos mensais de energia elétrica e alcançar a autossuficiência da propriedade rural, este Trabalho de Conclusão de Curso analisou sistema de energia solar fotovoltaica na propriedade rural Santa Luzia, Bela Vista - MS com o consumo de energia mensal de 395,83 kWh, feito o dimensionamento para essa demanda de potência de 3.498,00 W, protocolando o processo de homologação na concessionária ENERGISA e desenvolve o projeto elétrico, emissão de ART e protocolado apos isso selecionados os equipamentos sendo o custo o total de 16.000,00$ pago a vista, instalação durou um período de 3 dias finalizado foi feita a ligação do sistema e a troca do relógio, a ENERGISA feito a vistoria foi liberando a geração, o sistema atendeu a demanda da propriedade e as expectativas do proprietário nos 24 meses após a instalação sendo viável pois o sistema no seu 3 ano já vai estar se pagando. Nesses últimos meses analisando as contas observamos que houve um aumento de consumo e o saldo de créditos diminuindo gradativamente tendo em vista uma a análise para a ampliação desse sistema para que se atenda novamente o kWh a mais consumidos, não foi possível acompanhar o sistema mês a mês por falta de conectividade na propriedade rural, dificultando a avaliação dos padrões comportamentais mensais.
Abstract: As a free and abundant source of energy, the sun governs all biological activities on the planet and can be used for the generation of electrical energy. With the advancement of technology, the discovery of semiconductor materials, and the development of photovoltaic cells, a range of possibilities has opened up, enabling the growth and expansion of investments and studies focused on the generation and storage of electrical energy from solar sources. Currently, the solar energy market is in full development, thanks to the reduction in equipment costs and the return on investment period. This is due to the possibility of installing grid-connected photovoltaic systems, which allow the generation of energy credits with the utility company. In an effort to reduce monthly electricity costs and achieve self-sufficiency on a rural property, this thesis analyzed a photovoltaic solar energy system on the Santa Luzia rural property in Bela Vista, Mato Grosso do Sul, with a monthly energy consumption of 395.83 kWh. The system was designed to meet this power demand of 3,498.00 W. The homologation process with the energy company Energisa was initiated, and the electrical project was developed, including the issuance of the necessary documents and the selection of equipment. The total cost of the system was $16,000, paid upfront. The installation took three days to complete, and after the system was connected and the meter replaced, Energisa conducted an inspection and approved the generation. The system met the property's demand and the owner's expectations in the 24 months following installation, making it viable as it would pay for itself by the third year. In recent months, as we analyzed the bills, we noticed an increase in consumption and a gradual decrease in the credit balance. Considering this, there is a need to analyze the expansion of the system to meet the additional kWh consumed. Unfortunately, it was not possible to monitor the system month by month due to a lack of connectivity on the rural property, making it difficult to assess monthly behavioral patterns.
Palavras-chave: Energia solar
Solar energy
Sistema conectado à rede
Grid-connected system
Energia renovável
Renewable energy
CNPq: CNPQ::CIENCIAS AGRARIAS::ENGENHARIA AGRICOLA::ENERGIZACAO RURAL
Idioma: por
País: Brasil
Editor: Universidade Federal da Grande Dourados
Sigla da Instituição: UFGD
metadata.dc.publisher.department: Faculdade de Ciências Agrárias
Citação: CASTRO, Gustavo Pleutin; PLEUTIN, Tainá Ribeiro Rodrigues. Dimensionamento e instalação de sistema fotovoltaico On-grid na propriedade rural Santa Luzia. 2023. 55 f. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Agrícola) - Faculdade de Ciências Agrárias, Universidade Federal da Grande Dourados, Dourados, 2023.
Tipo de Acesso: Acesso Aberto
URI: http://repositorio.ufgd.edu.br/jspui/handle/prefix/5839
Data do documento: 8-Set-2023
Aparece nas coleções:Engenharia Agrícola

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
GustavoCastroeTaináRibeiroPleutin.pdf2,41 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.